Data Center Power Calculator
Facility inputs
Auto-fills the field below with a representative value — edit freely after selecting.
kW
1.20×
N+1 adds standby capacity for one failed unit — typically 1.15–1.25× of facility power.
Ratio of total facility power to IT load. 1.5 is a common industry-average assumption.
$/kWh
Enter a rate to estimate annual energy cost.
Total IT Load
—kW
— MW
What your servers, storage, and networking actually draw.
Total Facility Power
—kW
— MW
IT load plus cooling, power distribution loss, and other overhead (via PUE).
Redundant Capacity Required
—kW
— MW
Capacity to provision, including backup, at your selected redundancy level.
IT Load vs. Facility Power vs. Redundant Capacity
IT Load
Facility Power
Redundant Cap.
Estimated Annual Energy
— MWh/yr
Total facility power × 8,760 hours per year.
Estimated Annual Cost
Enter a rate
Based on the electricity rate entered at left.
All calculations run locally in your browser — no inputs are stored or transmitted. Figures are planning estimates only; confirm final electrical and mechanical design with a licensed engineer before construction. Published by Core Insights Review (coradvisors.net).